Viejo San Acacio, Colorado
Ben Doon, Costilla County Administrator
Tommy Rodriguez, ORC
Completed Project
- Project Needs Assessment: A comprehensive Project Needs Assessment (PNA) was developed to evaluate the necessary improvements to implement measures to upgrade the existing drinking water system, treat iron and manganese and meet Secondary Maximum Contamination Levels. The secondary concern was the existing distribution system deficiencies to install additional and larger water mains, as well as fire hydrants. The major selected improvements consisted of:
- A new concrete masonry unit (CMU) treatment building
- A new iron/manganese filtration system with backwash recovery
- New back-up power supply
- Storage tank improvements that include the installation of high/low level alarms
View Full Portfolio